Pre-built walls were put in place for the first floor. These walls are constructed traditionally and sheathed with a water-resistive air barrier (green in color). Later a foot thick insulated wall will be added to the outside to achieve an overall (including windows) insulation R value of 60. Building in this manner makes it easier for the interior work to be completed in a familiar manner. The steel beam will support the weight of the second floor.
Framing delivered and barrier installed
Installing the first floor walls
Preparing for the second floor
Straight, Plumb, Level, Square and now Airtight
Crawl space insulation and roof
First floor preparation, TJI base
First floor concrete and first envelope trusses
Excavating, trusses and crawlspace stairway
Fiberboard installation and wrap
Wiring, insulation, porch roof
Mechanical system installation
Wood floors and exterior painting
Exterior concrete, kitchen cabinets
WKAR interview, floor finishing
Exterior concrete, crawlspace walls and floor
Compressors, exterior lights, tile
Exemplary results in blower door test
Upstairs floor finishing, water conditioner
First Holly Passive House Conference
Energy Wise Homes
Bostwick Excavating
Hanneman and Fineis Concrete Construction
RTM Heating & Cooling
Bach Electric
GoldStar Hardwood
Randy Lalone Well Drilling
Nu•Wool Premium Cellulose Insulation
Pro Trees Unlimited
Spartan Painting
Reynolds Water Conditioning, Co.
Mitsubishi Electric Cooling & Heating
Green Building Advisor article