jung haus
michigan’s first certified passive house
Here we share some observations about and snapshots of the Passive House we had built in Oakland County, Michigan. All photographs were taken by us unless otherwise noted.
—Maura and Kurt Jung
Tuesday, 22 May 2012
The second floor deck and walls are complete and the overhead joists are being placed. The attic space above the second story ceiling will have two compartments. The lower of these will be a decked, conditioned space suitable for storage. Above that will be the roof insulation space. Its bottom will be an airtight deck and its top the roof deck.
Framing delivered and barrier installed
Installing the first floor walls
Preparing for the second floor
Straight, Plumb, Level, Square and now Airtight
Crawl space insulation and roof
First floor preparation, TJI base
First floor concrete and first envelope trusses
Excavating, trusses and crawlspace stairway
Fiberboard installation and wrap
Wiring, insulation, porch roof
Mechanical system installation
Wood floors and exterior painting
Exterior concrete, kitchen cabinets
WKAR interview, floor finishing
Exterior concrete, crawlspace walls and floor
Compressors, exterior lights, tile
Exemplary results in blower door test
Upstairs floor finishing, water conditioner
First Holly Passive House Conference
Energy Wise Homes
Bostwick Excavating
Hanneman and Fineis Concrete Construction
RTM Heating & Cooling
Bach Electric
GoldStar Hardwood
Randy Lalone Well Drilling
Nu•Wool Premium Cellulose Insulation
Pro Trees Unlimited
Spartan Painting
Reynolds Water Conditioning, Co.
Mitsubishi Electric Cooling & Heating
Green Building Advisor article