Wednesday, 26 September 2012
While the septic system is being installed behind the house, the water compression tank and mechanical systems are going in place indoors.
The flexible, smooth-interior ducts provide a dedicated connection between the energy recovery system and the supply and return grills. Some rooms are supplied with conditioned air and others are connected to the exhaust side.
Framing delivered and barrier installed
Installing the first floor walls
Preparing for the second floor
Straight, Plumb, Level, Square and now Airtight
Crawl space insulation and roof
First floor preparation, TJI base
First floor concrete and first envelope trusses
Excavating, trusses and crawlspace stairway
Fiberboard installation and wrap
Wiring, insulation, porch roof
Mechanical system installation
Wood floors and exterior painting
Exterior concrete, kitchen cabinets
WKAR interview, floor finishing
Exterior concrete, crawlspace walls and floor
Compressors, exterior lights, tile
Exemplary results in blower door test
Upstairs floor finishing, water conditioner
First Holly Passive House Conference
Energy Wise Homes
Bostwick Excavating
Hanneman and Fineis Concrete Construction
RTM Heating & Cooling
Bach Electric
GoldStar Hardwood
Randy Lalone Well Drilling
Nu•Wool Premium Cellulose Insulation
Pro Trees Unlimited
Spartan Painting
Reynolds Water Conditioning, Co.
Mitsubishi Electric Cooling & Heating
Green Building Advisor article